REGULAR MEETING, GENOA TOWN BOARD
NOVEMBER 06, 2002

A Regular meeting of the Genoa Town Board was held on November 06, 2002 at the Genoa Town Hall 1000 Bartnick Road, Genoa, New York 13071.

The Meeting was called to order at 7:30 P.M.

Open Public Meeting for 2003 Budget

Salute To The Flag

PRESENT:
Supervisor Richard Harrison
Councilman Dale Sellen
Councilman Kenneth Manzari
Town Clerk Karen Shields
Councilperson Lorie Fessenden
Water Control David Reeves

ABSENT: Highway Superintendent David Powers
Councilman Ronald Marshall

OTHERS PRESENT: Hans Pecher

CORRECTION TO 10-09-02 MINUTES:

The Water Shed Program dues are $900.00 not $1,300.00 as reported in October 09, 2003 minutes.

APPROVAL OF MINUTES:

Motion to approve minutes with corrections for 10-09-02

Motion by Fessenden
2nd by Sellen
Sellen-aye
Manzari-aye
Harrison-aye
Fessenden-aye

Clerks report for November 30, 2002

Motion To approve clerks report by Manzari
2nd by Fessenden
Sellen-aye
Manzari-aye
Harrison-aye
Fessenden-aye

Building and Grounds

The deck at the Town Hall is complete. Roger Vary did a wonderful job. Have had numerous compliments.

Code Enforcement Report:

Permits issued were: M Connor, B Chidsey, Ecker, Parsons & Boles. Inspections for October were: Nobles, Ramundo, Fire on Lake Road, Miller, Sheils Trailer issued CO, Ranundo reinspect, French and Back.

Highway Report

Finished up trees, bushes, ditching and most of dirt work on Mayo Road. Soil and Water spread some straw on banks for us. David Reeves graded most of gravel roads again. Hauled our cinders in for winter. Town of Ledyard loaded them for us. Some of the other towns ( Moravia, Venice) helped us haul also. Have new tires on 1 ton Dodge Truck and '95 IH. Hauled gravel from O'Tool in Moravia to Ledyard. Getting things ready for the white stuff.

Water Report

The average water for October 2002 was 79,000 gallons per day. Price on pump and motor to from Gartner Equipment. Price is approximately $5,500.00 for pump and $1,400.00 for motor. The new pump will pump 110 gallons @ minute and the old was only 50-55 gallons per minute.

Supervisors Report for September 30, 2002.

The board made a motion to accept report with exception of following changes. A9999 account was over paid for $1.60, which was to NYS withholding tax.

Motion by Sellen
2nd by Fessenden
Sellen-aye
Manzari-aye
Harrison-aye
Fessenden-aye

Assessor update:

Jay Franklin has accepted contract and will be done with assessment update by end of November 2002.

Closed Budget Hearing. The Town Board accepted a tentative budget for 2003 due to a flaw in the procedure. There will be a printed procedure to follow for next year.

Approval of bills: Motion to approve the following bill numbers:
G-221-G-234 for $ 16,146.17
H-118-H-129 for $ 14,968.53
W-099-W-103 for $ 3,821.07
Total Disbursements $ 34,935.77

Motion by Manzari
2nd by Fessenden
Sellen-aye
Manzari-aye
Harrison-aye
Fessenden-aye

NEW BUSINESS: Lynn O'Dell from the Town of Ledyard was present to tell us about property set back rules. He explained how buying a piece of property and not finding out where the neighbors septic or well are located could be dangerous to the drinking water in some cases. If your neighbor has a well dug or septic system close to his line and you move in and dig a well or put in septic to close to the line could become a problem. His suggestion was to have better rules for set back on property.

OLD BUSINESS: We will wait for another town to try the Arial Photo Program before we get into it. The Transportation Project for 2003 will be filled out by Richard Harrison and submitted with a check for $500.00.

Meeting adjourned at 8:45 pm.

Motion by Sellen
2nd by Fessenden
Sellen-aye
Manzari-aye
Harrison-aye
Fessenden-aye

Advertise next Meeting to be December 11, 2003 at Town Hall 7:30 pm.